Story
后退
1

Slipway

Length: 127 m
Covered Length: 100 m
Ship length (max) 150 m

2

Floating Dock 1

Covered Length: 128,75 m
Total: 141,25 m
Beam: 23,4 m
Lifting Force: 4.600 t

3

Floating Dock 2

Covered Length: 140,8 m
Total: 153,6 m
Beam: 27,8 m
Lifting Force: 10.000 t

4

Pier

Length: 150 m
Beam: 10m

5

Refit & Shipbuilding Shed

Length: 85 m
Beam: 36,1 m

6

Shipbuilding Shed

Length: 107,57 m
Beam: 31,3 m

7

Prefabrication Shed

Length: 90 m
Beam: 22,54 m

8

Prefabrication Shed

Length: 55 m
Beam: 30,71 m

9

Office

Rendsburg

New Build

1

Slipway

Length: 127 m
Covered Length: 100 m
Ship length (max) 150 m

2

Floating Dock 1

Covered Length: 128,75 m
Total: 141,25 m
Beam: 23,4 m
Lifting Force: 4.600 t

3

Floating Dock 2

Covered Length: 140,8 m
Total: 153,6 m
Beam: 27,8 m
Lifting Force: 10.000 t

4

Pier

Length: 150 m
Beam: 10m

5

Refit & Shipbuilding Shed

Length: 85 m
Beam: 36,1 m

6

Shipbuilding Shed

Length: 107,57 m
Beam: 31,3 m

7

Prefabrication Shed

Length: 90 m
Beam: 22,54 m

8

Prefabrication Shed

Length: 55 m
Beam: 30,71 m

9

Office

Rendsburg

New Build

让我们建造属于您的游艇

期待您的来电